Monday 14 December 2009

Roles played in Production

In the first half I controlled the DVD player, and so was in main charge of getting the VT inserts ready , for the director and vision mixer to use when needed. it was quite a simple job really, just sit around and press play and pause, then at the odd time, tell the director through the coms link that the VT's were ready. Most of the first half went fine, however on several of the inserts, the vision mixer cut out way to early, in doing so, the clip and question didn't really fit.
These were in the Music round, and were specifically the JLS and Girls Aloud, which were the pixelated vts. They were cut way to early, so the contestants werent able to see them. Apart from that the first half everything Being in this position, one needs to be alert at all times, so nothing goes wrong.


In the second half I played a member of the auidence

No comments:

Post a Comment